-
2020
Siheung Incinerator Power Plant Open
Turtle Island Wave Park Heat (steam) Supply
-
2019
merger of KG CS Energy
-
2018
Designation of promising environmental companies in Gyeonggi-do in 2019
-
2017
Completion of tungsten oxide manufacturing facility
-
2016
JUWONJEONJU Convention on the Supply of Waste Resources
-
2015
Acquired Petroleum Coke Boiler(from SK)
-
2014
2014.03 Expanded Copper(II) Oxide, Electroplating Grade production facility (an annual production capacity of 2,400tons)
-
2013
2013.10 Completed Copper(II) Sulfate Pentahydrate production plant
2013.07 Listed on KOSDAQ.
-
2011
2011.12 Merged into KG Eco Solution
-
2011
2011.12 Awarded USD 10 Million Export Tower.
2011.07 Quality Management System certification(ISO 9001:2009)
2011.01 Expanded high-purity copper oxide production facility, wastewater treatment facility, and steam production boiler.
-
2010
2010.11 Awarded USD 5 Million Export Tower.
2010.04 Joined KG Affiliation.
2010.02 Licensed for liquid PCBs business.
-
2009
2009.02 Licensed for asbestos business (licensed for scaffold and structural dismantlement industry by the Ministry of Labor).
2009.02 Launched Copper(II) Oxide, Electroplating Grade
2009.01 Started production of Copper(II) Oxide, Electroplating Grade
-
2008
2008.06 Acquired a patent for Copper(II) Oxide, Electroplating Grade
-
2005
2005.08 Designated as specialized waste analyzer by the National Institute of Environmental Research.
-
2003
2003.08 Selected as outstanding TMS operator (awarded Minister of Environment Award).
-
2002
2002.06 Certified for International Environmental Management System (ISO 14001:2004).
2002.06 Certified for Safety & Public Health Management System (OHSAS 18001:2007).
-
2001
2001.12 Selected for outstanding environmental preservation (awarded Minister of Environment Award).
-
1999
1999.10 Eco Services Korea established (by Rhodia Eco Services). Acquired shares of Veolia(50%) & Teris(50%)
-
2010
2010. 01 Completed a petroleum cokes boiler and started commercial service
-
2009
2009.05 Signed the agreement with STX Energy to share heat source in an emergency
2009.05 Constructed a petroleum cokes boiler
-
2006
2006.12 Completed a SCR De-NOx system
2006.06 Completed steam-lines from Korea Environmental Development Corp., Sunglim Oil & Chemical Co., Ltd.
-
2005
2005.10 Joined KG Affiliation.
-
2004
2004.11 Registered a central load dispatching power plant and completed a heat storage tank
2004.10 Completed a steam-line from Green Center in SiHeung City Facilities Management Corp.
-
2003
2003.12 Completed a steam-line from Eco Services Korea Co., Ltd.
2003.09 Completed a steam-line network in Chemical Complex
-
2002
2002.08 Signed the contract of ESCO Business for a steam-line network in Chemical Complex
2002.08 Signed the contract of heat supply based on a basic charge
-
2001
2001.05 Held a completion ceremony of facilities
2001.04 Completed a CO-GEN boiler
2001.01 Started heat supply to Dyeing Industrial Complex
-
2000
2000.12 Completed an auxiliary boiler
-
1996
1996.12 Founded ShiHwa Energy Co., Ltd.
1996.05 Acquired the license of Community Energy System